Stationary Assets Installation & Configuration
Lesson Highlights
Name of the lesson
Stationary Assets Installation & Configuration Flow
Purpose of the lesson
The objective of this lesson is to provide the user with a detailed description of the:
Pre-Installation
Installation it self
Configuration processes
Target Audience
End-users of the system such as technicians, service providers, back-office, organization managers, etc.
It is highly recommended to go through the contents in the order in which they appear.
- 1 Lesson Highlights
- 2 Pre-Installation
- 3 Installation
- 4 Configuration Process
- 4.1 Power Center Basic Configuration
- 4.2 Galooli Solution Basic Configuration
- 4.2.1 Organization Tree
- 4.2.2 Unit Configuration
- 4.2.3 Copy Settings
- 4.2.4 Manual Configuration
- 4.2.5 Overview Tab
- 4.2.6 Configuration Tab
- 4.2.7 Events Tab
- 4.2.8 Information Tab
- 4.2.9 End Of The Process
- 4.3 Checkout Form
Pre-Installation
Prior to performing the installation, technicians should become familiar with the equipment installed on the site. The site survey is one of the steps that significantly reduces installation time and improves the accuracy of the technicians work on the day of installation.
The form consists of a technical review of the components of the telecom site. It is designed to plan the future installation on the site and calculate how many and which Galooli gateways need to be prepared in advance.
Site Survey - Template
Installation
The installation process, which is usually performed by a qualified technician, plays a critical role in receiving accurate data from the site. In order to facilitate the installation and its results, it is important to carry out the process properly and with advance preparation.
Prior to arriving on site, review the bill of materials (BOM) list and ensure you have all the necessary equipment and hardware. The technical booklet provides detailed information about the hardware that should be installed.
Installation Form - It is very important to use the installation form (prepared in advance by Galooli) before and during installation. Upon arrival at the site, the form must be opened immediately.
Installation Form - Template
Configuration Process
The configuration process of a new gateway in an organization is a crucial step in receiving proper data from the gateway and obtaining the maximum amount of accurate data from the Galooli solution.
There are several steps involved in the configuration process. Some are the same for all gateways, while others are specific to each gateway. Follow the instructions carefully in order to avoid missing important details.
Power Center Basic Configuration
Step 1 - Connection to Power Center
To perform configuration through the Power Center platform, it is necessary to connect to the gateway. Depending on the type of gateway, the connection can be physical (Serial) or over the air (OTA). Please refer to the following link for details regarding each Gateway connection method - Stationary Asset Gateways
Step 2 - Basic Configuration
Different gateways require different configuration processes, but the process of adding sensors to the gateway is the same.
Please refer to the following link for various configuration documents - Stationary Asset Gateways
Galooli Solution Basic Configuration
Organization Tree
Open the Galooli Solution >> Click on the “Manager” application >> Click on “My Units” >> It is recommended that you create meaningful clusters and groups in your organization tree that will assist you in managing all future gateways. My Units
Unit Configuration
Open the Galooli Solution >> Click on the “Manager” application >> Click on “My Units” >> Locate the relevant gateway within the "Stock" cluster and click on it.
In the event that you own an active gateway in your organization, you can copy all or part of the configurations to the new gateway using the following ways:
Copy Settings
Copy settings from the organizational KPI settings - My Units | Copy Settings. It is important to note that this new gateway will automatically receive the relevant configurations if your organization has an organizational KPI configured.
Copy Settings from the unit level settings- Copy Settings
Clone Unit - My Unit | Clone Unit
If this is the organization's first gateway, please follow the steps below.
Manual Configuration
Locate the relevant unit within the "Stock" cluster and click on it. My Unit
Overview Tab
The "Overview" tab should be field according to the organization preferences:
The ID should be provided by the Galooli support team.
Set the gateway a meaningful Name.
Set the gateway Activation Date. As a general rule, the activation date will be the date when the unit was created, but if the unit was created before today in the Stock cluster, you may need to adjust the activation date accordingly.
Set the “Asset Type”. Asset types should correspond to the types of units that the gateway connects to.
Set the "Stationary Unit" to "Yes".
Set the destination Email and SMS for future notifications. Email and phone numbers can be set at the cluster or group level as opposed to the unit level.
The remainder of the information can be filled in as needed.
https://galooli.atlassian.net/l/cp/GUAkk1K4
Configuration Tab
On the "Configuration" tab >> Click on the “IO’s” submenu >> Add inputs and outputs, followed by calibration tables. On the basis of the IO’s settings, it will be possible to define events in the system later on - https://galooli.atlassian.net/l/cp/sfiBfhtN. Using the technical booklet provided by Galooli, it is possible to determine what inputs and outputs need to be included.
On the “Configuration” tab >> Choose the “Device Configuration” submenu >> Choose the layout code appropriate to the type of the site. Using the technical booklet provided by Galooli, it is possible to determine the layout code.
Device Configuration | Layout sectionOn the “Configuration” tab >> Choose the “Device Configuration” submenu >> Check the display configurations of the necessary components in the relevant sections. In order to find the relevant sections, it is recommended that you work with the Power Center and the technical booklet. Those configurations affect dashboards and reports in terms of alerts and calculations.
Device Configuration | Configuration sectionOn the "Configuration” tab >> Select the “Maintenance", set the relevant maintenance dates.
MaintenanceOn the "Configuration” tab >> Select the “Installation Setup", set all the relevant installation setups.
Installation SetupsOn the "Configuration" tab >> Choose “KPI” submenu, set all the relevant fields and thresholds that affect dashboards and reports in terms of alerts and calculations. It is recommended that you work with the Power Center and the technical booklet.
KPI
Events Tab
On the "Events" tab, add the relevant events and set the destination emails and phone numbers.
https://galooli.atlassian.net/l/cp/zjX0vNmg
Information Tab
On the "Information" tab >> Choose the “Unit” submenu >> Select the “Hardware” section >> Enter the "SIM Phone Number" and "SIM Serial Number". Information | Unit
On the "Information" tab >> Choose the “Additional Information” submenu >> It is important to add additional information about the unit in order to display relevant information. Information | Additional Information
Category: Site Info >> Section: Certification >> Certification = Certified
End Of The Process
Click on “Save”
Transfer the unit from the "Stock" cluster to different relevant cluster.
https://galooli.atlassian.net/l/cp/J6c4DHE1Verify that the unit can be seen on the Panorama map and that the Panorama time stamp is being updated.
https://galooli.atlassian.net/l/cp/hth1o23t
As each gateway includes unique configuration processes, it is highly recommended that you review the knowledge documents of the gateway in question to ensure that your configurations are in accordance with them.
Stationary Asset Gateways
Checkout Form
Before leaving the site and completing the installation, the checkout form is intended to ensure that the installation process has been completed correctly. There is a test process included in the form that includes the installation and configuration of the hardware. In order to complete the form, the installer and the back office of the organization must work together.
Online Pre-Made Forms Store | Checkout Form
Technician
Finish complete installation as per technical booklet
Configure all devices in Power Center platform
Fuel accuracy test done (if relevant)
Installation and QA report completed and submitted
Backoffice
Installation and QA report review
Configuration checks
Alarm test
Jotform checkout report completed