Installation Preparation
Before you get started make sure you have the following:
Battery Cell Monitoring kit:
-Battery Cell Monitoring HUB
-Battery Cell Monitoring Sensor (2/12 V)
-Battery Cell Monitoring Hall Sensor
-Different adapters and cablesElara unit
Lead acid batteries
The power source of +12V DC to power the Galooli RTU (Elara)
Electrical wires
ETH wire
Electronic tools – screwdriver, multimeter, & f-crimp tool
Additional information:
The Battery Cell Monitoring HUB and the Elara are designed to be installed on a din rail
Configuration Preparation
PC or laptop computer
Power Center installed - Click here to download. Credential info can be received from your Account Manager or Galooli support
ZonMax installed - Click here to download. Credential info can be received from your Account Manager or Galooli support
Download the Battery Cell Monitoring Internal Software (PBMS2000 Monitoring Software)
RS485 to USB converter - Refer here for driver installation instructions.
Note! Make sure your computer recognizes the COM port at the “Device manager”. Otherwise, install the proper driver.