Skip to end of banner
Go to start of banner

Battery Cell Monitoring - Preparation

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 7 Next »

Installation Preparation

Before you get started make sure you have the following:

  • Battery Cell Monitoring kit:
    -Battery Cell Monitoring HUB
    -Battery Cell Monitoring Sensor (2/12 V)
    -Battery Cell Monitoring Hall Sensor
    -Different adapters and cables

  • Elara unit

  • Lead acid batteries

  • The power source of +12VDC or 48VDC to power the Galooli RTU (Elara) and the Battery Cell Monitoring HUB

  • Electrical wires

  • ETH wire

  • Electronic tools – screwdriver, multimeter, & f-crimp tool

 Additional information:

  • The Battery Cell Monitoring HUB and the Elara are designed to be installed on a din rail

Configuration Preparation

  • PC or laptop computer

  • Power Center installed - Click here to download. Credential info can be received from your Account Manager or Galooli support

  • ZonMax installed - Click here to download. Credential info can be received from your Account Manager or Galooli support

  • Download the Battery Cell Monitoring Internal Software (PBMS2000 Monitoring Software)

  • RS485 to USB converter - Refer here for driver installation instructions.

  • The Elara should be connected and configured to the rectifier before the battery cell monitoring unit is installed and configured

Note! Make sure your computer recognizes the COM port at the “Device manager”. Otherwise, install the proper driver.

  • No labels