Skip to end of banner
Go to start of banner

CE Transducer CE42 - Preparation

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Installation Preparation

Before you get started make sure you have the following:

  • Project’s Wiring diagram - Provided by Galooli Support

  • CE Transducer CE42 Meter

  • The power source of +12V DC to power the Galooli RTU (Elara)

  • Electrical wires

  • Electronic tools – screwdriver, Multimeter, & f-crimp tool

 Additional information:

  • The device is designed to be installed on a din rail

  • Make sure that you have sufficient space for its mounting

  • We recommend mounting the AC meter next to phase breakers - this act can simplify the process of disconnecting the cables from the breakers, passing the load cables through the meter, and then connecting them back to the breakers

Configuration Preparation

  • PC or laptop computer

  • Power Center installed - Click here to download. Credential info can be received from your Account Manager or Galooli support

  • ZonMax installed - Click here to download. Credential info can be received from your Account Manager or Galooli support

  • RS485 to USB converter - Refer here for driver installation instructions.

  • Project’s Wiring diagram - Provided by Galooli Support.

Note! Make sure your computer recognizes the COM port at the “Device manager”. Otherwise, install the proper driver.

  • No labels