Skip to end of banner
Go to start of banner

Battery Cell Monitoring - ZonMax Configuration

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

ZonMax Layout Configuration

After you finished wiring and configuring the device, we can move on to the device’s configuration on the ZonMax platform.

  1. Open ZonMax using your credentials.

2. Select the relevant unit you wish to configure.

3. Navigate to “Live Display” and check the “Config” radio button.

4. Go to the “Global” section and check “Grid voltage phases 1, 2, and 3” under the global section.

5. If a relay is connected to the generator then go to the “Generators” section and check the “DG 1\2 running”.

6. Click “Save”.

ZonMax IO Configuration

  1. Double-click the relevant unit and navigate to the “IO’s” tab.

2. Double-click on “Click to Add” for whichever type of input you want.

Input Name

Input Type

Description

AC_Meter_Grid_Total_KWH

Analog

Power coming from X phase

AC_Meter_Grid.V.L[X]

Analog

Voltage value for phase - X

AC_Meter_Grid.I. L[X]

Analog

Current for phase X

AC_Meter_Grid. Disconnected

Digital

If communication exists or not

Input Name

Input Type

Description

AC_Meter_Generator_[X]_Total_KWH

Analog

Power coming from X phases

AC_Meter_Generator.V.L[X]

Analog

Voltage value for phase - X

AC_Meter_Generator.I. L[X]

Analog

Current for phase X

AC_Meter_Generator. Disconnected

Digital

If communications exists or not

Input Name

Input Type

Description

Colo_Meter[X].Total_KWH

Analog

Power coming from X phases

Colo_Meter[X]. V.L[Y]

Analog

Voltage value for phase - X

Colo_Meter[X].I. L[Y]

Analog

Current for phase X

Colo_Meter[X]. Disconnected

Digital

If communications exists or not

  • No labels