DC Meter CE11 - Phase Lines Installation

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

Before the cables are threaded through the DC Meter ring please note the direction of the device is crucial; it will determine if the value of the current is positive or negative – please follow the below instructions carefully:

The DC meter has two sides:

  • Front View is marked with a dot (".").

  • Back View is marked with a plus (“+”). The DC cable goes through the plus side

  1. Open the clamp, by turning the orange knob. Place the DC load cables through the opening, close the clamp, and lock it, by turning the knob to its original position.

2. Connect the voltage wires - ports 1 & 4 - to the positive “+” & negative (-48VDC from the site rectifier) “-” load voltage respectively.

Please note:

  • When the DC power is in the reverse direction:

    • It will present negative currents on the Power Center Status A field

    • It will not accumulate any kilowatt hours; it shall remain reading a constant figure example 1Kwh for a long time.

  • It is vital to verify the direction of the DC power, making sure that it is correct for the reasons mentioned above

  • Upon connection, verify that the currents are positive, the kilowatt hours are recorded, and no alarm appears on the ZonMax

  • Do not leave the premises without verifying the proper direction