Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Full Document - https://galooli.atlassian.net/l/cp/rvaXdpmq

  • New X-Ray Fields
    A number of new fields have been created in order to analyze the X-ray data:

    Battery C-rate
    Walk-in Enable
    Complete Recharge by Solar
    MAX MPPT Difference V
    MIN MPPT Difference V
    LVD Reconnect
    PLD Reconnect
    Configuration - MIB
    Controller Device Model
    Power current limit enabled
    Power System Current limit (A)
    Solar Idiff
    Solar Idiff Hysteresis
    Solar Idiff Delay Timer
    DG off voltage 2

    Removal of X-ray Fields
    X-RAY.Rectifier-X.Faulty Rectifiers
    X-RAY.Rectifier-X.Soalr Converter FaultyFuel Summary Field

    Fields that calculate the estimated number of days to refuel tank 1\2. These fields will be added to a new group of fields called "Oracle".

    Full Document - Oracle Fields
     

  • Switching Between Galooli Applications
    Many Galooli users use multiple applications, and their workflow involves moving between the applications constantly.

    By clicking on a specific unit in the end report, you can switch between the following applications:

    • Panorama

    • Manager >> My units

Full Document - Reports Results

...

  • Selected Fields Improvements
    A number of improvements have been made to the report creation process with an emphasis on the management of fields within the report:

    • Fields will be grayed out if the user hovers over them

      Image Added
    • A button has been added that opens the "Select Fields" window when the field is selected

      Image Added

    • The search mechanism has been improved so that the user does not have to enter the exact name of a field.

      Image Added
  • Share Report
    When a report is shared with you and saved in the system, an option will appear to open the specific report directly in Galooli Pro application.

    Full Document - My Shared Reports

...

  • Scheduled Reports Data Aggregation
    An option has been added to the mechanism of summary scheduled reports for determining the aggregation of the data according to: Aggregated/Daily/Weekly/Monthly period covered by the report.

    Full Document - https://galooli.atlassian.net/wiki/spaces/KP/pages/edit-v2/2817654787

  • Dashboard Designer Improvements
    In the tooltip of the "Chart" item, the title is now bold and more data is displayed.

  • Selected Fields Improvements
    A number of improvements have been made to the report creation process with an emphasis on the management of fields within the report:

    • Fields will be grayed out if the user hovers over them

      Image Removed
    • A button has been added that opens the "Select Fields" window when the field is selected

      Image Removed

    • The search mechanism has been improved so that the user does not have to enter the exact name of a field.

      Image Removed

  • Energy Devices Field Changes
    In order to make the "Energy Devices" summary reports easier to read, the field names have been changed. Additionally, the location of the fields of “Solar Module 1-8” has been changed from "Energy Devices" to "Rectifiers".

    Full Document - Energy Devices Fields

  • Grid Credit/Balance Fields
    Fields related to grid credit/balance have been moved from the "Energy Global Fields" category to the "Oracle Fields” category.

    Full Document - https://galooli.atlassian.net/l/cp/hvPf5D0S

  • Dashboard Designer - Table Rows Number
    There are now 150 rows available to display in the dashboard designer table as opposed to 60 previously.

    Image Added

Full Document - Table Item

  • Filtering capabilities of the Dashboard Designer
    The dashboard designer now has an option to filter out empty fields.

    Full Document - Configuration Section

  • New X-Ray Fields
    A number of new fields have been created in order to analyze the X-ray data:

    Battery C-rate
    Walk-in Enable
    Complete Recharge by Solar
    MAX MPPT Difference V
    MIN MPPT Difference V
    LVD Reconnect
    PLD Reconnect
    Configuration - MIB
    Controller Device Model
    Power current limit enabled
    Power System Current limit (A)
    Solar Idiff
    Solar Idiff Hysteresis
    Solar Idiff Delay Timer
    DG off voltage 2

  • Removal of X-ray Fields
    X-RAY.Rectifier-X.Faulty Rectifiers
    X-RAY.Rectifier-X.Soalr Converter Faulty

  • System Reports
    With this version, the "Service Name" field has been removed from the "SMS Log" report.

...