This document outlines the installation process of the Galooli solution, dividing it into three primary phases:  

...

The following chart outlines the structure of the three phases described below:

...

Pre-installation

The pre-installation phase is crucial for establishing the foundation for a successful deployment of the Galooli solution. This phase has two primary objectives: 

...

Estimated Installation Time by Scope  

Scope 

Number of Sites 

Installation Time (H) 

Total Time (H) 

Total Time (D) 

Basic 

120 

3

240 

360

10 

15

Medium 

500 

1

2,

500 

500

62

104.

17

Advanced 

250 

7

1,

000 

750

41

72.

66 

92

Total  

970 

870 

 -

2

4,

740 

610

114

192.

09

Installation

The installation phase centers on the essential on-site activities required to ensure that all physical components are correctly installed and fully operational. This phase is vital for establishing the infrastructure necessary for the Galooli solution to function effectively. 

  1. Pre-Installation Checklist: This checklist must be completed by the Project Manager of the Installation Team before arriving on site to ensure that all preparations are in place. 
    Pre-Installation Checklist 

  2. Installation Form: This form must be filled out by the Installation Team on site to document the installation process and confirm that all tasks have been completedbeen completed. 
    Galooli Installation Form

  3. Checkout Report: The on-site Installation Team is responsible for completing this report to confirm the successful completion of the installation process before leaving the site
    Galooli Installation Form Checkout Form (jotform.com) 

Post-installation

The post-installation phase focuses on verifying the successful completion of the installation and ensuring that data from the connected assets is being transmitted seamlessly to the Galooli Cloud. This phase also involves any necessary troubleshooting and final adjustments to maintain ongoing reliability and optimal system performance. The phase concludes with the customer’s approval, confirming that data streaming and validity meet the required standards. 

  • Checkout Report: The on-site Installation Team is responsible for completing this report to confirm the successful completion of the installation process before leaving the site. 
     Checkout Form (jotform.com) 

  • Data Accuracy Validation: A data "sanity check" must be performed within 48 hours after installation, in coordination with back-office and/or NOC personnel, to validate the integrity and accuracy of the data. 
    Data Validation Form  

  • Customer Approval: The installation process is only considered complete upon receiving formal written confirmation from the customer’s Project Manager, confirming their satisfaction with the installation. 

...

Below are estimated installation times per device and Site Scope: 

SN 

Device 

Average Time (Minutes) 

SCOPE 1 

SCOPE2 

SCOPE 3 

Gateway 

20 

20 

20 

20 

Rectifier SNMP Integration 

30 

30 

30 

30 

Battery BMS Integration 

30 

30 

30 

30 

DC Meter 

20 

20 

20 

20 

Grid AC Meter 

40 

  

40 

40 

AC Tenant Meter 

40 

  

40 

40 

Temperature Sensor 

25 

  

25 

25 

Door Sensor 

25 

  

25 

25 

Smoke Sensor 

25 

  

25 

25 

10 

Generator Panel Integration 

20 

  

  

20 

11 

Ignition Relay installation 

20 

  

  

20 

12 

Fuel sensor Installation 

55 

  

  

55 

13 

Checkout 

30 

30 

30 

30 

14 

DB/Tray 

20 

20 

20 

20 

 

 

400 (6.7 Hrs.) 

150 ( 3 Hrs.) 

305 (5Hrs) 

400 (7 Hrs.) 

Team Members  

The following table outlines the estimated number of back-office staff and technicians required for new installations and ongoing maintenance. These figures are based on assumptions for an average project and are subject to change depending on project-specific conditions and evolving circumstances. 

TASK 

BACK-OFFICE STAFF 

TECHNICIANS 

New installation 

Ongoing Maintenance 

Training 

To advance the installation process, Galooli must collaborate with the customer and/or partner to develop a comprehensive Installation, Configuration, and Software training program. The key components of this program are as follows: 

...

Scope 

Duration (Hours)  

Duration (Days) 

4-5 

8-11 

1.5 

10-13 

Software Overview  

2-3 

Materials  

 Tools Tools 

Basic Installation Kit: Installation Kit - Galooli Knowledge Base - Confluence (atlassian.net)  

# 

ITEM DESCRIPTION 

Unit ( Pc/Mtr/Set of) 

Comments 

Draw tape 

Per roll of 50M 

Fitted with a flexible head and draw eye for minimal resistance whilst navigating cable through conduit with multiple bends 

Foldable ladder 2.5 m 

pc 

2.6m height, Aluminum Alloy 

Allen Keys Set 

Set of 9pcs 1.5mm-10mm 

2, 2.5, 3, 4, 5, 6, 8, 10mm(each for 1 PCS) Material: CR-V 

Cable Stripper 

pc 

LY25-1: Wire diameter: 4-28MM 

Pliers 

pc 

Specification:7“, Length:203mm, Maximum shearing ability: iron wireφ3.0, copper wireφ3.5 

Screw Drivers Set 

Set of 6pcs (3 Star and 3 Flat) 

8 PCS G series screwdriver set 

600A DC/AC Clamp meter 

pc 

  

Side cutter - Small size 

pc 

max opening: 14mm, length: 119mm, weight: 0.19kg 

Wire Stripper/Cutter 16-26 AWG 

pc 

for cutting wire, 30mm max, stripping wire 0.2-1.25mm² 

10 

Rechargeable BOSCH Mini Portable Drill + Batteries 

pc 

Mini Portable Electric Drill for driving screws and nuts  

11 

Hand Lugging tool 

pc 

  

12 

Mobile smart phone 

pc 

  

13 

Laptop 

pc 

  

14 

Laptop bag 

pc 

  

15 

SD Card Reader USB 

pc 

  

16 

RS485 to USB Converter 

pc 

  

17 

HDMI Cable 

pc 

  

Consumables 

# 

Item 

UOM 

Qty per site 

Specifications 

Remarks 

Cable lugs SC4-4 

Pcs 

SC4-4/Screw hole: M4 
Wire cross-sectional area:4mm² 

Included in Installation KIT 

End Cables Pack - Red 

Pcs 

Wiring range: 1.0mm² Tube Length: 10mm 

Included in Installation KIT 

End Cables Pack - Black 

Pcs 

Wiring range: 1.0mm² Tube Length: 10mm 

Included in Installation KIT 

End Cables Pack - Orange 

Pcs 

Wiring range: 1.0mm² Tube Length: 10mm 

Included in Installation KIT 

End Cables Pack - Blue 

Pcs 

Wiring range: 1.0mm² Tube Length: 10mm 

Included in Installation KIT 

Cable ties White - 3.6*300 

Pcs 

10 

3.6mm x 300mm; white color 

Included in Installation KIT 

Insulating tape 

Pcs 

PVC electrical insulation tape black color, 10M per roll 

Included in Installation KIT 

Flexible conduit White 3/4 

Mtrs 

10 

internal diameter 23mm;/external diameter 28.5mm 
Material: Polypropylene Flame-retardant grade: V0 

Included in Installation KIT 

2 Meter Ethernet Cable 

Pcs 

CAT6e/ 2m 

Included in Installation KIT 

10 

12 Meter Ethernet Cable 

Mtrs 

CAT6e/ 12m 

Included in Installation KIT 

11 

4 Core Cable 

Mtrs 

10 

4 Core Cable (4 X 1.0 mm²) 

Included in Installation KIT 

12 

2 Core Cable 

Mtrs 

10 

2 Core Cable (2 X 1.0 mm²) 

Included in Installation KIT 

13 

Earth Cable Yellow Green 

Mtrs 

4mm 

Included in Installation KIT 

14 

Blind Rivets Small 

Pcs 

1/8 inch x 1/2 inch 

Included in Installation KIT 

15 

Self Tapping Screws 

Pcs 

8mm*1.5 inch 

Included in Installation KIT 

16 

Drill Bits 4mm 

Pcs 

  

Included in Installation KIT 

 Assumptions  Assumptions  

  1. Experience-Based Estimates: All aspects of the installation, including time estimates, required consumables, and the necessary team size, are based on Galooli's and its partners' accumulated experience from thousands of installations worldwide. 

  2. Basis for Installation Times

...