Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Before you get started make sure you have the following:

  • Battery Cell Monitoring kitKit:-

    • Battery Cell Monitoring HUB

    -
    • Battery Cell Monitoring Sensor (2/12 V)

    -
    • Battery Cell Monitoring Hall Sensor

    -Different
    • There are different adapters and cables included in the Battery Cell Monitoring Kit

  • Elara gateway

  • Power source to the Elara gateway of 12V

  • Power cables for the Elara gateway - two cables with a thickness of 0.5mm. The length of the cables is determined by the distance between the power source and the Elara gateway

  • Lead acid batteries

  • The power source of 24VDC or 48VDC to power the Battery Cell Monitoring HUBElectrical wires

  • Communication cables. Cables with a thickness of 0.5mm. The length of the cables is determined by the distance between the sensors and the surrounding environment

  • Ethernet wire

  • Electronic tools – screwdriver, multimeter, & f-crimp tool

  • RS485 To USB Converter & two 0.5mm thick communication cables. The length of the cables is determined by the distance between the RS485 to the USB converter and the computer

 Additional information:

  • The Battery Cell Monitoring HUB and the Elara are designed to be installed on a din rail

...

Note! Make sure your computer recognizes the COM port at the “Device manager”Manager”. Otherwise, install the proper driver.

...