Installation Preparation

Before you get started make sure you have the following:

  • Battery Cell Monitoring kit:
    -Battery Cell Monitoring HUB
    -Battery Cell Monitoring Sensor (2/12 V)
    -Battery Cell Monitoring Hall Sensor
    -Different adapters and cables

  • Elara unit

  • Lead acid batteries

  • The power source of +12V DC to 12VDC or 48VDC to power the Galooli RTU (Elara) and the Battery Cell Monitoring HUB (12VDC or 48VDC)

  • Electrical wires

  • ETH wire

  • Electronic tools – screwdriver, multimeter, & f-crimp tool

...