Skip to end of banner
Go to start of banner

Holykell HPT604 - Preparation

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Installation Preparation

  • Fuel tank (20L or 5.3 US gallons)

  • Fuel hand pump

  • The calibration tube will be assembled by the client

  • RS485 USB to serial configuration cable and adaptor

  • Assorted pair of screwdrivers

  • ¾ inch hollow copper rod

  • Measuring tape

  • Zip-ties

  • 35mm (1.4”) Bi-metal hole saw.

  • Power drill

  • Diesel fuel

  • Junction box – we recommend at least IP 65

Configuration Preparation

  • PC or laptop computer

  • Calibration Calculator

  • Power Center installed - Click here to download. Credential info can be received from your Account Manager or Galooli support

  • ZonMax installed - Click here to download. Credential info can be received from your Account Manager or Galooli support

  • RS485 to USB converter - Refer here for driver installation instructions

  • Project’s Wiring diagram - Provided by Galooli Support

Note! Make sure your computer recognizes the COM port at the “Device manager”. Otherwise, install the proper driver.

  • No labels