  1. Connect the Battery Cell Monitoring HUB to a +12V DC or 48V DC power source
    תמונה

  2. The LED green light should be on - indicating a successful power connection.
    תמונה

  3. Connecting the Battery Cell Monitoring Hall Sensor in the correct manner and with the appropriate string.

    It is important to verify the direction and connection in accordance with the wiring diagram.
    תמונות

  4. The Battery Cell Monitoring Sensor's cables should be connected to the lead acid batteries
    תמונות

  5. חיבור ה The Battery Cell Monitoring Sensor's לסוללות עצמן

  6. חיבור בין ה-The Battery Cell Monitoring Sensor's

  7. חיבור ה-The Battery Cell Monitoring Sensor's ל-Battery Cell Monitoring HUB

  8. חיבור ה-Battery Cell Monitoring HUB בעזרת RS485 ללפטופ

  9. קונפיגורציה דרך התוכנה (עם ובלי רקטיפייר)

  10. חיבור האלרה לחשמל

  11. חיבור האלרה למחשב (כבל או מרחוק)

  12. לחבר בין האלרה לHUB ישירות או דרך סוויצ'

  13. לבדוק אלרה IP

  14. לרשום IP נכון

  15. add modbus eth criver

  16. Chnage IP

  17. ZonMAX >> LAYOUT