Pre-Installation

...

Prior to performing the installation, technicians should become familiar with the equipment installed on the site. The site survey is one of the steps that significantly reduces installation time and improves the accuracy of the technicians work on the day of installation.

The form consists of a technical review of the components of the telecom site. It is designed to plan the future installation on the site and calculate how many and which Galooli gateways need to be prepared in advance.
Site Survey - Template

Installation

The installation process, which is usually performed by a qualified technician, plays a critical role in receiving accurate data from the site. In order to facilitate the installation and its results, it is important to carry out the process properly and with advance preparation.

  • Prior to arriving on site, review the bill of materials (BOM) list and ensure you have all the necessary equipment and hardware. The technical booklet provides detailed information about the hardware that should be installed.

  • Installation Form - It is very important to use the installation form (prepared in advance by Galooli) before and during installation. Upon arrival at the site, the form must be opened immediately.
    https://form.jotform.com/232172934483459 - Example

Configurations Process

...

Configuration Process

The configuration process of a new gateway in an organization is a crucial step in receiving proper data from the gateway and obtaining the maximum amount of accurate data from the Galooli solution.

...

Step 2 - Basic ConfigurationTBA

Different gateways require different configuration processes, but the process of adding sensors to the gateway is the same.

Please refer to the following link for various configuration documents - Stationary Asset Gateways

Galooli Solution Basic Configuration

...

End Of The Process

Note

As each gateway includes unique configuration processes, it is highly recommended that you review the knowledge documents of the gateway in question to ensure that your configurations are in accordance with them.
Stationary Asset Gateways

Checkout Form

...

עם מה משתמשים?

...

Before leaving the site and completing the installation, the checkout form is intended to ensure that the installation process has been completed correctly. There is a test process included in the form that includes the installation and configuration of the hardware. In order to complete the form, the installer and the back office of the organization must work together.
https://galooli.atlassian.net/wiki/spaces/KP/pages/2554986506/Online+Pre-Made+Forms+Store#Checkout-Form

Technician

  • Finish complete installation as per technical booklet

  • Configure all devices in Power Center platform

  • Fuel accuracy test done (if relevant)

  • Installation and QA report completed and submitted

...

  • Installation and QA report review

  • Configuration checks - מזה?

  • Alarm test

  • Jotform checkout report completed

...