Skip to end of banner
Go to start of banner

SmartGen

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

image-20240326-073459.png

image-20240326-073551.png

image-20240326-074840.png

Supported Models

HGM6120N (Generator Controller)
SGUE485 (USB to RS485 Converter)

Communication Method

RS485 (Via Convertor)

Network configuration

Device Baudrate

9600

Supported Services

Parameters

Alarm Name

Alarm Criticality

Remote Controlling

Engine Hours

 

 

Voltage_Phase_1-2

 

 

Grid_Voltage_Phase_1_3

 

 

Current_Phase_1-3

 

 

Frequency

 

 

Engine_Speed

 

 

Battery_Voltage

 

 

Coolant_Temperature

 

 

Oil Pressure

Total Output KWH

Working_Mode

 

 

Installation and Configuration

Preparation

  • Galooli Gateway (Including an active SIM card).

  • Power source for the Gateway.

  • Power cables for the Gateway. Two cables with a thickness of 0.5mm. The length of the cables is determined by the distance between the power supply and the Gateway.

  • SmartGen Geset HGM6120N Controller + SGUE485 (USB to RS485 Converter).

  • 2 x 120 ohm resisters.

  • Screwdriver (Slotted & Phillips).

Installation

In the installation process mentioned bellow, the images and steps describe the Galooli Elara gateway installation, however any other Gateway can be connected.

  1. Assemble the Galooli gateway and ensure there is a power source available and that it is connected correctly to the Gateway. Gateway Solutions

  2. Connect the USB cable from the SmartGen controller to the SGUE485 (USB to RS485 Converter).

    image-20240326-083633.png
  3. Connect 2 RS485 communication cable between the SGUE485 (USB to RS485 Converter) and the Galooli Gateway RS485 input.

    image-20240326-083831.png

  4. One resistor should be installed on the SGUE485 (USB to RS485 Converter) and one resistor should be installed on the Galooli Gateway.

    image-20240326-083955.png
  5. If necessary, mount all the devices on a din rail.

  6. The Galooli gateway should be powered on.

  7. Ensure that all devices are turned on.

Configuration

TBA

  • No labels