Skip to end of banner
Go to start of banner

Holykell HPT604 - Preparation

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

Installation Preparation

  • Fuel tank (20L or 5.3 US gallons)

  • Fuel hand pump

  • The calibration tube will be assembled by the client

  • RS485 USB to serial configuration cable and adaptor

  • Assorted pair of screwdrivers

  • ¾ inch hollow copper rod

  • Measuring tape

  • Zip-ties

  • 35mm (1.4”) Bi-metal hole saw.

  • Power drill

  • Fuel (Diesel, Gasoline)

  • Junction box – we recommend at least IP 65

Configuration Preparation

  • PC or laptop computer

  • Calibration Calculator

  • Power Center installed - Click here to download. Credential info can be received from your Account Manager or Galooli support

  • ZonMax installed - Click here to download. Credential info can be received from your Account Manager or Galooli support

  • RS485 to USB converter - Refer here for driver installation instructions

  • Project’s Wiring diagram - Provided by Galooli Support

Note! Make sure your computer recognizes the COM port at the “Device manager”. Otherwise, install the proper driver.

  • No labels