Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Field Name

Field Meaning and Logic



Engine Hours Tampering

The digital field becomes "True" when the difference in engine hours exceeds the difference in records by more than two hours.
[2 < (ABS(engine hours difference - time difference]. The unit will display an alert if such a situation occurs.

  • Additionally, when the above flag is set to true, an alert will appear on the NOC application.

  • The alert will only be active at the time of the unit's transmission. In order to receive an effective alert in the NOC application - set the alert without an “Activation Delay Time”, and set a sufficient “Release Delay Time” (so that the alert does not close automatically too quickly).

  • The alert will be applied only to units with a generator panel installed (not applicable to units without a generator panel).

Load Power

This is the direct reading of the power value from the generator or from the AC/DC meters that are connected to it.

Gen PF1

generator panel, or a calculation based on the voltage, current and PF read from the generator panel.


Gen PF 1-3 (Power Factor)

The Power Factor (PF) reading from the generator panel. The Power Factor will be filled with a default value of 0.95 if there is no power factor for the phase and no direct reading of power, voltage, and current (all three).

Over Current

An Urgent alert will appear when the system detects an 'Over Current' condition.

Short Circuit

An Urgent alert will appear when the system detects an 'Short Circuit' condition.