Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Basic data about the grid and the alarms related to it

...

Provides real-time voltage and current data across multiple phases. This ensures accurate power distribution and load balancing across the grid, reducing the risk of overloads and ensuring system reliability.

WhatsApp Image 2024-09-25 at 14.39.34-20240925-113947.jpegImage Added
  • Phase 1-3 V

  • Phase 1-3 A

  • Power

  • Total kWh

  • Power Factor

  • Upcoming Loadshedding