Tip |
---|
This dashboard may be used on more than one unit or site. Different information will be displayed at the unit level and at the multi-unit level. If you wish to switch between the unit level and the multi-unit level, simply peak the relevant area of the organization tree, and the data will be updated automatically. |
Table of Contents | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Unit Level Dashboard
Refuel Planners Sub-Dashboard
The Overview sub-dashboard focuses on a single unit and provides a detailed summary of the unit's current performance and issues.
Maintenance Visits Planner Sub-Dashboard
The Overview sub-dashboard focuses on a single unit and provides a detailed summary of the unit's current performance and issues.
Multi-Unit Level Dashboard
Refuel Planners Sub-Dashboard
The Overview sub-dashboard provides an overview of the system's current status by showing the total number of active events and affected units.
Maintenance Visits Planner Sub-Dashboard
...
Refuel Planners Dashboards - Multi Unit Display
Based on predictive analytics, this dashboard determines the number of days your generator will need to be refueled.
Key Takeaways:
In order to predict the number of days for refueling, the system analyzes the fuel consumption pattern and generator usage pattern for each one of the sites.
The dashboard displays the number of days left to refuel for each unit, and helps to prioritize which units needs to be refueled first.
...
Less Than 1 Week Until Next Refuel
The number of units that required refueling within one week.
More Than 1 Week Until Next Refuel
The number of units that need to be refueled after one week.
Generators Average Fuel Consumption
The average fuel consumption rate, based on the summary field Generator Load Based Consumption. Whenever there's an illogical result in the fuel consumption parameters, the field calculates an estimated consumption based on the generator's load and the KVA.
5 Top Units in Need of Urgent Refueling
In accordance with the estimated days to the next refueling, here are five units that require an urgent refueling.
Estimated Days to Refuel per Unit
A list of all the generators selected by the user to appear on the dashboard, with details of the unit name, the number of days until the next refueling, the amount of liters currently in the generator, and the average amount of a liter per hour consumed by each generator.
Refuel Planners Dashboards - Single Unit Display
...
Estimated Days Until Next Refuel
The number of days until the fuel in the tank runs out, based on the run hours patterns and the fuel consumption rate of the generator.
Generator KVA
The KVA category can be set in My Units –> Generators.Generator 1,2.KVA
Average Engine Hours per Day
The average generator run hours within the chosen time frame.
Top of Form.
Average Fuel Consumption Rate
The average fuel consumption rate, based on the summary field Generator Load Based Consumption. Whenever there's an illogical result in the fuel consumption parameters, the field calculates an estimated consumption based on the generator's load and the KVA.
Fuel Consumption and Engine Hours Trend
The cumulative engine hours of the generator daily, coupled with the fuel level measured at the day's end (derived from the Generator Final Fuel Level summary field).
Maintenance Visits Planner Dashboard - Multi Unit Display
...
Maintenance Visits Planner Dashboard - Single Unit Display
...