Preparation

Installation Preparation

Before you get started make sure you have the following:

  • Carlo Gavazzi EM210 Meter

  • The power source of +12V DC to power the Galooli RTU (Elara)/Carlo Gavazzi EM210

  • Power cables for the Elara/Carlo Gavazzi EM210 gateway - two cables with a thickness of 0.5mm. The length of the cables is determined by the distance between the power source and the Elara/Carlo Gavazzi EM210 Meter gateway

  • RS485 To USB Converter & two 0.5mm thick communication cables. The length of the cables is determined by the distance between the RS485 to the USB converter and the computer

  • Screwdriver (Slotted & Phillips)

  • Communication cables for the Carlo Gavazzi EM210 inputs and outputs. Cables with a thickness of 0.5mm. The length of the cables is determined by the distance between the sensors and the surrounding environment

  • Electronic tools – screwdriver, multimeter, & f-crimp tool

 Additional information:

  • The device is designed to be installed on a din rail

  • Make sure that you have sufficient space for its mounting

  • We recommend mounting the AC meter next to phase breakers - this act can simplify the process of disconnecting the cables from the breakers, passing the load cables through the meter, and then connecting them back to the breakers

Configuration Preparation

  • PC or laptop computer

  • Galooli Software Solution link

  • Power Center installed - Click here to download.

  • RS485 to USB converter - Refer here for driver installation instructions.

  • Technical Booklet - Provided by Galooli Support team.

Note! Make sure your computer recognizes the COM port at the “Device Manager”. Otherwise, install the proper driver.

Power Connection

  1. Connect the device to a power source with a minimum voltage of 40V. This AC meter's power pins are the phases themselves. One phase is enough to power the meter.

  2. Make sure the LED is lit green.

 Connection Connection to the Computer

It is highly recommended that you perform this step within the office before you leave for the field

  1. Connect the RS485 converter to the PC/laptop and connect the other ends of the wires to that AC meter. RS-458 Adaptor connected to the PC

 

Terminal number

Description

16

RS-485 B data port

15

RS-485 A data port

ID Configuration

After everything is connected, we can start the process of changing the ID of the AC meter, according to the wiring diagram.

  1. Open the Power Center.

  2. Open the “Active Device” drop-down menu, and select the “Power Device”.

  1. Open the “Connect Via” drop-down menu, and select the relevant Serial COM port.

  1. Navigate to the “Services Center” tab and select AC Meter (EM210) - Make sure that the AC Meter is the only device connected to the computer!

  1. The “AC Meter (EM210) Configuration Wizard” will pop up, click “Next

6 Set the “Communication Baudrate” to 19200

  1. Check the “ID Scan Mode” – to find the current ID default of the device

Please note! If the current device ID is set according to your wiring diagram, then no additional action is needed, and move on to the next stage.

  1. Click “Next.”

  2. In “Device ID” – set the ID device according to your wiring diagram, then click the “Set New Configuration” button.

Please note! Make sure that the “Communication Baudrate” stays on 19200.

10. An AC “Meter Configuration” window will pop up.

11. Click “Yes.

12. Once the Power Center detects the device, values will appear in the “Reading Results” section:

13. Click on “Cancel” or the X icon and move to the next stage.

Elara Connection

Connecting the AC meter to the Elara Terminal Block

  1. Connect the RS-485 cables from the AC meter to the Terminal Blocks of the Elara tray.

 

 The terminal number on the AC

 The terminal number on the AC

Description

Functionality

8/9/10

Phases and powering pins are the same. One phase is sufficient to power the unit

Power

15

Elara’s terminal block Orange A data port

RS485 A

16

Elara’s terminal block the Blue B data port

RS485 B

 

 

Elara Configuration

After you have configured the ID of the device, you can now connect the AC meter directly to the Elara unit as described in the Carlo Gavazzi EM210 Installation document.

  1. Open the PowerCenter (if the power center was already open, close it, and re-open it).

  2. Open the “Active Device” drop-down menu and select “Elara”.

  3. Open the “Connect Via” drop-down menu and select the relevant Serial COM port.

  1. Navigate to the “Elara” tab.

  1. Navigate to the “Configuration” tab 

  2. Click the “Read Configuration” button.

  1. In the Configure tab click the “Add Port 1 Device”.

  1. The “Elara – Modbus Device Configuration” window will pop up:

a. Open the “Devices” first drop-down menu and select “AC_ Meter”.

b. Open the “Devices” second drop-down menu and select “EM210.”

c. Choose the most suitable ring according to the size conversion ratio.

 

d. Input the ID of the sensor in the “Physical Device ID” & “Virtual Device ID” (according to the previous configuration).

e. Make sure the “Device Budrate” is 19200, as you set it earlier.

f. Click “Apply”.

  1. Click the “Write Configuration” button to save the changes. 

10. Click the “Reset” button.

11. Navigate to the “Status” tab to view the status of the AC Meter.

 Phase Lines Installation

Safety: 

  • Before installing the load cables and connecting the voltage lines, it is necessary to cut off the AC power. Once the wiring procedure is completed, you may turn the AC power back on

  • Any electrical installment should be carried out only by a certified high voltage electrician

After setting up all the configurations, we can start with the actual phase line installment.

  • The AC power meter is designed to operate on a 1 to a 3-phase system

  • For three-phase installations, all three load cables should be connected to the AC meter

  • For single-phase installations, only one load cable should be connected to the AC meter

  1. Disconnect the phase wires from the circuit breakers.

  2. Connect the phase power lines to the designated pins on the AC meter

a. 8 = phase 1(L1)

b. 9 = phase 2(L2)

c. 10 = phase 3(L3)

  1. Reconnect the phase power lines to the original circuit breaker location.

PIN#

NAME

8

L1

9

L2

10

L3

15

RS485 A

16

RS845 B

17

GND

CT Rings Installation

Carlo Gavazzi EM210 Ac meter works only with Rogowski CT ring.

  1. The AC power cable should be threaded through the Rogowski CT ring as shown in the picture below.

     

  2. Connect the cables from the Rogowski CT ring to the AC meter according to the relevant phase (according to the arrow).

 

Galooli Solution Configuration

Galooli Solution Device Configuration

After you finished the installation and Power Center configuration of the device, we can move on to the device’s configuration on the Galooli solution platform.

  1. Open the Galooli solution and login using your credentials.

  2. Open the Manager application >> My units >> Select the relevant unit you wish to configure.

  3. If a relay is connected to the generator then go to the “Configuration” tab >> “Device Configuration” >> “Section: Generators” >>check “Generator X running“.

  4. Go to the “Configuration” tab >> “Device Configuration” >> “Section: Grid” >>check “Grid voltage phases 1, 2, and 3”.

  5. Click “Save”.

Galooli Solution IO Configuration

  1. Open the Manager application >> My units >> Select the relevant unit you wish to configure.

  2. Click on “IO’s” >> Click to “Add” for whichever type of input you want to add.

  3. Click “Save” in the end of the process.

Please note! The AC meter can be installed in various locations according to the wiring diagram, we will provide configuration information as a function of the Meter’s location:

Input Name

Input Type

Description

AC_Meter_Grid_Total_KWH

Analog

Power coming from X phase

AC_Meter_Grid.V.L[X]

Analog

Voltage value for phase - X

AC_Meter_Grid.I. L[X]

Analog

Current for phase X

AC_Meter_Grid. Disconnected

Digital

If communications exists or not

Input Name

Input Type

Description

AC_Meter_Generator_[X]_Total_KWH

Analog

Power coming from X phases

AC_Meter_Generator.V.L[X]

Analog

Voltage value for phase - X

AC_Meter_Generator.I. L[X]

Analog

Current for phase X

AC_Meter_Generator. Disconnected

Digital

If communications exists or not

Input Name

Input Type

Description

Colo_Meter[X].Total_KWH

Analog

Power coming from X phases

Colo_Meter[X]. V.L[Y]

Analog

Voltage value for phase - X

Colo_Meter[X].I. L[Y]

Analog

Current for phase X

Colo_Meter[X]. Disconnected

Digital

If communications exists or not