Lesson Highlights

Name of the lesson

...

The objective of this lesson is to provide the user with a detailed description of the installation and configuration processes that must be followed in order to maximize the potential of Galooli stationary gateways and Galooli software.:

  • Pre-Installation

  • Installation it self

  • Configuration processes

Target Audience

End-users of the system such as technicians, service providers, back-office, organization managers, etc.

Info

It is highly recommended to go through the contents in the order in which they appear.

Table of Contents

Pre-Installation

...

TBA

Checkout Form

TBA

Technician

  • Finish complete installation as per technical booklet

  • Configure all devices in Power Center platform

  • Fuel accuracy test done (if relevant)

  • Installation and QA report completed and submitted

Backoffice

  • Installation and QA report review

  • Configuration checks

  • Alarm test

  • Jotform checkout report completed

...

Installation

The installation process, which is usually performed by a qualified technician, plays a critical role in receiving accurate data from the site. In order to facilitate the installation and its results, it is important to carry out the process properly and with advance preparation.

  • Prior to arriving on site, review the bill of materials (BOM) list and ensure you have all the necessary equipment and hardware. The technical booklet provides detailed information about the hardware that should be installed.

  • Installation Form - It is very important to use the installation form (prepared in advance by Galooli) before and during installation. Upon arrival at the site, the form must be opened immediately.
    https://form.jotform.com/232172934483459 - Example

Configurations Process

קיימת אפשרות לקנפג יחידה לפני שהולכים להתקנה , תלוי בפרוקיט ובלקוח

The configuration process of a new gateway in an organization is a crucial step in receiving proper data from the gateway and obtaining the maximum amount of accurate data from the Galooli solution.

...

Step 2 - Basic Configuration

TBA

Galooli Solution Basic Configuration

...

Note

As each gateway includes unique configuration processes, it is highly recommended that you review the knowledge documents of the gateway in question to ensure that your configurations are in accordance with them.
Stationary Asset Gateways

Checkout Form - הסבר מזה ?

עם מה משתמשים?

מי עושה מול מי את המבדיקה?

Technician

  • Finish complete installation as per technical booklet

  • Configure all devices in Power Center platform

  • Fuel accuracy test done (if relevant)

  • Installation and QA report completed and submitted

Backoffice

  • Installation and QA report review

  • Configuration checks - מזה?

  • Alarm test

  • Jotform checkout report completed