...
A detailed list of subjects to be covered, problems, and challenges
Number of participants, their experience, and role in the company
When Installation demonstration is required, what asset and its relative location to head office
Special equipment that is required or missing
POC for coordination and preparation of training
...
Integration Test Suite
Unit Testing for Sensors and Data Acquisition Device
Test each sensor individually to ensure it is providing accurate and reliable data (analog parameters & alarms).
Check for any anomalies or errors in data collection.
Simulate a 'Sensor Disconnected' scenario and check for the proper indication from the system.
Local Communication Testing
Ensure that the data is transmitted accurately and in the expected format.
Verify that the data collection device can handle both digital and analog data.
Cloud Connection Testing
Ensure Data transmission interval are accurate by reviewing the logged transmission time (via Galooli Pro)
Ensure that the full data payload is identical to the data collected by the control ( compare controller reading with Galooli Panorama - Live).
Ensure that the device responsible for sending data to the cloud can establish a secure and reliable connection.(Galooli Panorama - Live)
Test data transmission to the cloud to confirm that the server is receiving the correct data (Check ECS logs via Kibana solution).
Error Handling Testing
Simulate scenarios where the network connection is poor or temporarily unavailable.
Test how the system handles and recovers from communication failures or interruptions.
Scalability Testing
Test the system's ability to handle the maximum scenario (MAX number of sensors in a given location) .
Ensure that the data transmission process remains efficient and reliable as the system scales.