Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • A detailed list of subjects to be covered, problems, and challenges

  • Number of participants, their experience, and role in the company

  • When Installation demonstration is required, what asset and its relative location to head office

  • Special equipment that is required or missing

  • POC for coordination and preparation of training

...

Integration Test Suite

Unit Testing for Sensors and Data Acquisition Device

  • Test each sensor individually to ensure it is providing accurate and reliable data (analog parameters & alarms).

  • Check for any anomalies or errors in data collection.

  • Simulate a 'Sensor Disconnected' scenario and check for the proper indication from the system.

Local Communication Testing

  • Ensure that the data is transmitted accurately and in the expected format.

  • Verify that the data collection device can handle both digital and analog data.

Cloud Connection Testing

  •  Ensure Data transmission interval are accurate by reviewing the logged transmission time (via Galooli Pro)

  • Ensure  that the full data payload is identical to the data collected by the control ( compare controller reading with Galooli Panorama - Live).

  • Ensure that the device responsible for sending data to the cloud can establish a secure and reliable connection.(Galooli Panorama - Live)

  • Test data transmission to the cloud to confirm that the server is receiving the correct data (Check ECS logs via Kibana solution).

Error Handling Testing

  • Simulate scenarios where the network connection is poor or temporarily unavailable.

  • Test how the system handles and recovers from communication failures or interruptions.

Scalability Testing

  • Test the system's ability to handle the maximum scenario (MAX number of sensors in a given location) .

  • Ensure that the data transmission process remains efficient and reliable as the system scales.