...
Follow the instructions provided in the following link to complete the Galooli Elara gateway
...
...
installation process - 1. Power & Connectivity (Direct to the Elara). Once the process has been completed, proceed to the next step.
Connect a 470 ohm resistor between Elara input 1 and input 2.
...
Connect the Elara input 1 via a wire to the negative power input of the Elara.
...
Connect the
...
DWYER Temperature Transducer positive input to the Elara positive input.
...
Connect the
...
DWYER Temperature Transducer negative input to Elara input 2.
...
...
...
Connect the RTD Probe with Armored Cable for Liquids and Gases to the DWYER Temperature Transducer
...